The owner who hauled more than 1,000 buckets of earth and mud from its basement by hand now asks to tear the brick building down.
Timothy Klusczinski wrote that he hauled more than 1,000 five-gallon buckets of earth and mud out of the Chapin Carriage House basement by hand. Tonight, his request to tear the building down goes before the Historic Preservation Commission.
The commission will hold a public hearing Monday, Nov. 16, on his application to demolish the structure at 621 Chapin Place, in the Chapin Park Local Historic District. Commission staff recommend approval.
He needs a certificate of appropriateness: the commission's approval, required for exterior work, including demolition, on a property in a local historic district.
The staff report describes a three-story brick "bank barn" built about 1852. Arched ground-level doors faced north and were potentially used for horses. South-facing doors on the elevated second level were used for carriages. The top story could have been a hayloft.
Twice since, the building has appeared to lose a story. Around the turn of the century, the exposed north wall of the bottom level was back-filled, turning that level into a basement. In the late 1960s, a snow load caused a catastrophic roof collapse, and the top story was eliminated during reconstruction.
Klusczinski's application says the fill was soil and sand from a nearby water source, with clam shells present, and no stabilization or groundwater measures. Over time, he wrote, earth and water took their toll on the bottom of the north wall.
Buckets and bricks
When he took over the property, the application says, the building was so overgrown it was largely concealed from view. After clearing it, he found the bottom north wall had completely collapsed below ground. Earth had flowed inside.
Several companies refused to quote the excavation, concerned heavy equipment would further harm the structure, the application says.
"I designated myself for the task," Klusczinski wrote.
Over months, he wrote, he carried out the buckets and harvested about 1,800 bricks from the rubble, storing them inside. His plan was to brace the space, build a basement retaining wall and restore the north wall gap with the salvaged bricks.
He got a retaining wall in place during the early stages of the COVID-19 pandemic. But he could not find bricklayers familiar with lime putty mortar, and he boarded up the exposed wall.
The retaining wall was later dislodged and tipped inward, the application says. The staff report says dumping and vandalism have caused damage and made the site unstable.
Contractors are now even less willing to take the job, Klusczinski wrote, and the building deteriorates with every rain. "With a heavy heart and in the interest of public safety," he asks the commission to approve demolishing what he calls a "vestige element of the original Chapin family homestead."
A demolition quote in the packet totals $11,500; the application lists Bender & Son Construction as the contractor. Klusczinski wrote that there is little to reuse besides bricks and a few original wood windows.
The staff report, prepared by Historic Preservation Administrator Ross VanOverberghe, cites the collapse, a century of changes to the structure, the lack of interested contractors and cost, and concludes that deconstruction and salvage of materials is the most appropriate action.
The records do not agree on dates. The staff report puts the carriage house at about 1852. The commission's 2005 Chapin Park guidebook says Horatio Chapin bought forty acres after Alexis Coquillard's death in 1855, and calls Chapin's house at 601 Park Avenue, built between 1855 and 1857, "the oldest existing structure in the District." The guidebook's property entries do not list the carriage house. The records do not resolve the difference.
The packet contains no letters or comments from the public about the application.
The commission meets at 6 p.m. in the Council Chambers, on the third floor of City Hall, 215 S. Dr. Martin Luther King Jr. Blvd. The carriage house is the second of four certificate-of-appropriateness hearings. Online access is at www.southbendin.gov/HPCMeeting. The owner, architect or contractor must attend.
The district's guidelines set the test. Buildings, they say, "should not be demolished except where a building poses a threat to the public safety, and demolition is the only alternative." The guidelines prefer moving a building to demolishing it.
More stories about Chapin Park Local Historic DistrictSouth Bend Historic Preservation Commission
- Historic Preservation Commission staff report and application packet, COA 2026-1009, 621 Chapin Place (Nov. 9, 2026)(opens in a new tab)
- Historic Preservation Commission meeting agenda, Nov. 16, 2026(opens in a new tab)
- Chapin Park Local Historic District guidelines and guidebook, Historic Preservation Commission (2005)(opens in a new tab)
- St. Joseph County list of Chapin Park district properties(opens in a new tab)
This story was written with AI from the sources above. See something wrong? Tell us and we will correct it.
Comments
No comments yet.
Comments use your real name. To keep out fake accounts, we verify a US mobile number by text. We never show or share your number. Comment guidelines
Commenting as .
Replying to a comment.
Be civil and stay on topic. Criticism of anyone, including this paper, is welcome. Comments are reviewed before they appear. Guidelines
Comments open soon.