Sunday, November 29, 2026Sun, Nov 29

The South Bend Paper

Development, money and daily life in Michiana

Community

Honeywell to add two state-required test wells in Kennedy Park

A December 2024 sample from a well inside the park found vinyl chloride above a state cleanup goal, and regulators say no wells exist to show how far it extends.

By South Bend Paper AI Desk · November 20, 2026 at 8:50 AM

A water sample drawn in December 2024 from a well northeast of the baseball field in Kennedy Park contained vinyl chloride at 31 micrograms per liter, above a state residential cleanup goal.

State regulators could not tell how far it reached. "No monitoring wells currently exist downgradient of S22 to delineate dissolved VC," the Indiana Department of Environmental Management wrote to Honeywell on Aug. 28, 2025. S22 is the well's label, VC is vinyl chloride, and downgradient means in the direction groundwater flows.

IDEM wrote that Honeywell "must install" a new shallow well northeast of S22. It also required a new deep well northeast of an existing deep well, D4, which sits southwest of the Roger Street and Goodland Avenue intersection. Samples there had 1,2-dichloroethane and vinyl chloride above the same cleanup goals, and IDEM cited a "large data gap" between two other deep wells where the extent is unknown.

Both new wells are now planned for the park at 2700 Westmoor Street.

A groundwater monitoring well is a narrow well drilled so the water beneath the surface can be sampled and tested over time.

The newest record is an agreement filed with the South Bend Board of Park Commissioners for its Nov. 16, 2026, meeting. It lets Hyperion Environmental LLLP I, which the agreement describes as "a subsidiary of Honeywell Aerospace," enter the park to drill six borings and install two permanent monitoring wells. Benny Dehghi, president of Hyperion Holdco Sub LLC, signed for Hyperion on Sept. 22.

The board's amended agenda for that meeting listed a "SBVPA Right of Entry Agreement," presented by Michael Schmidt. Minutes are not yet posted. The board next meets Dec. 14.

The well plan is the response of Honeywell's consultant, Groundwater & Environmental Services Inc., to the state. In a Feb. 23, 2026, letter to the Board of Public Works, the firm said IDEM requested the two wells as part of the ongoing remedial effort for the Honeywell Industrial Complex, 3520 Westmoor Street.

Deep well D13 would go on the park's western edge, about 30 feet east of Goodland Avenue and about 560 feet south of Westmoor. It would be about 125 feet deep.

Shallow well S29 would go on the mid-northern edge, about 30 feet south of Westmoor between Meade Street and North Olive Street. It would be about 30 feet deep, with soil samples taken first.

The records reviewed show no other public statement from Honeywell.

Groundwater studied since 1982

The complex is a 110-acre facility that makes aircraft accessories and landing gear systems, according to IDEM's 2025 letter. Bendix Corporation made automotive and aircraft components there from 1919 to 1983. Allied Signal ran it through 1999, then merged with Honeywell International.

The site is in the state's Voluntary Remediation Program, under which a property owner cleans up contamination with IDEM oversight. IDEM wrote that all but one of six Areas of Concern at the facility have been addressed; a cleanup plan for PCBs in the last one is being developed under direction of the U.S. Environmental Protection Agency and IDEM.

Honeywell operates recovery wells to manage volatile organic compounds, or VOCs, in groundwater under the facility and off-site areas to the northeast. VOCs are chemicals that evaporate easily. Sampling happens twice a year on a network of 62 shallow, four intermediate and 13 deep monitoring wells.

The park has been part of the picture for decades. A 1982 investigation focused on Kennedy Park and detected VOCs in groundwater, according to an April 2001 work plan by consultant Harding Lawson Associates. More wells went into the park in 1983 and 1986.

That report, now 25 years old, said no solvents were detected in 11 soil gas samples collected in fall 2000 from the residential area, park and school. The consultant concluded vapor exposure to indoor or outdoor air was not of concern.

The records reviewed do not address current exposure in the park. The soil gas sampling IDEM required in 2025 is on the plant site.

The Park Board approved the wells March 16 on a 2-0 vote, contingent on a formal agreement. John Martinez, chief of park operations, presented the request, and the minutes say the locations would be adjusted to avoid conflicts with a new walking path. The South Bend Paper has reported that the park is in the middle of a roughly $16 million city renovation.

The agreement requires $5 million in aggregate insurance naming the city and a $15,000 bond. Disturbed paved or improved property must be restored "to its original state or better."

The wells stay until IDEM agrees they can be abandoned.

Until then, Hyperion owes the city a fact sheet by Dec. 1 of each year. It must name the contaminants of concern, their extent and the direction any contamination is moving.

What did you think of this story?

More stories about Kennedy ParkSouth Bend Park Board

Comments

No comments yet.

This story was written with AI from the sources above. See something wrong? Tell us and we will correct it.