Riverfront West design pushes city's Lochmueller payments past $1M
Payments to the engineering firm rose to $1.08 million in 2025 from $424,000 the year before, with two-thirds tied to the new neighborhood planned south of Wayne Street.
The South Bend Paper
Development, money and daily life in Michiana
Payments to the engineering firm rose to $1.08 million in 2025 from $424,000 the year before, with two-thirds tied to the new neighborhood planned south of Wayne Street.
A second amendment with Lochmueller Group adds $56,625 for permitting, soil testing and right-of-way work, months after the city hired Milestone to build the bridge.